Resource Management Guide

Resource Planning

Throughout our careers, weve learned that resource planning isnt just about scheduling people to tasksits about strategically using every resource available to ensure a projects success. Whether you’re working with a small team or managing a large portfolio of projects, resource planning can make all the difference between smooth sailing and constant chaos.

Everything in this guide is based on our experience of providing companies with the most effective resource planning tools and mechanisms. We’ve helped businesses across various industries streamline their planning processes and avoid costly pitfalls. Without a solid resource plan, you risk overspending, exhausting your team, or failing to meet your project milestones. But with the right planning approach, you can ensure your project stays on track, your resources are well-utilized, and your team remains productive and motivated.

Well dive into best practices, common pitfalls, and effective strategies for resource planning. Our goal is to help you understand not only how to plan your resources but also why its so critical.

At its core, resource planning is the process of identifying, organizing, and allocating the resourcessuch as people, tools, materials, and budgetsneeded to complete a project. It ensures that the right resources are available at the right time to meet project deadlines and goals.

But beyond just knowing whos working on what, resource planning answers essential questions like:

  • What resources do we need?
  • When do we need them?
  • Who is best suited for each task?
  • How can we balance the workload across the team?
  • What are the potential bottlenecks, and how can we prevent them?
  • How do we stay within budget while optimizing resources?

Good resource planning helps you anticipate these needs, allocate resources efficiently, and balance your teams workload, preventing both burnout and underutilization. It allows you to stay ahead of potential risks, such as resource shortages or task overlaps, and keeps your project moving forward while optimizing costs.

Failing to plan your resources can lead to a host of problems that can quickly spiral out of control. Weve seen it happen far too often. Heres what can go wrong when resource planning is ignored:

Missed deadlines

Without knowing when resources are available or needed, tasks will take longer than expected. Delays pile up, and soon your project timeline is completely derailed.

Team burnout

When resourcesespecially peopleare not allocated properly, some team members may end up overworked while others are underutilized. Overloading key team members leads to fatigue and mistakes, while underutilized workers may feel disengaged.

Unnecessary costs

Without a plan, you may find yourself needing last-minute resources, which often come at a higher cost. Or worse, you may allocate too many resources to a project and waste valuable assets.

Bottlenecks and confusion

Without clear planning, projects can hit bottlenecks where critical tasks are waiting for unavailable resources. This leads to idle time for the team, confusion about priorities, and frustration among project managers.

Scope creep

Without a resource plan, its harder to control the scope of the project. Unexpected changes or additional tasks can push your resources to the limit, increasing the risk of overruns in time and budget.
In short, not having a resource plan can turn even the best projects into a stressful, costly mess

Resource planning is the backbone of project management. A project can only be as successful as the resources available to complete it. If you dont have enough people, tools, or time to get the job done, youll struggle to meet your objectives. But with a solid resource plan in place, you can ensure your project runs smoothly and on time.

Here are a few reasons why resource planning is essential:

Prevents bottlenecks: By ensuring resources are allocated properly, you avoid situations where tasks pile up and slow down the project.

Optimizes costs: Effective resource planning helps you stay within budget by ensuring that no resources are over- or under-utilized.

Keeps teams productive and happy: Nobody likes being overworked or, conversely, not having enough to do. A well-balanced resource plan keeps everyone engaged without feeling overwhelmed.

Resource planning is your safety net, helping you foresee challenges, allocate your resources efficiently, and ultimately deliver successful projects.

In resource planning, it’s crucial to recognize the different types of resources youll need to manage effectively. Heres a quick breakdown:

  • Human Resources: This involves allocating people based on their skills, availability, and workload. Ensuring the right team members are assigned to the right tasks is key to productivity.
  • Material Resources: Managing physical assets like tools, equipment, and materials needed for the project. Proper planning prevents shortages or delays.
  • Financial Resources: Keeping track of your budget ensures that resources are available without overspending. Its important to monitor costs and stay within financial constraints.
  • Technology and Information Resources: These are the tools, software, and systems required to keep your project running smoothly. Efficient planning ensures you have the tech resources when you need them.

In this guide, we will primarily focus on human resource planning and show you how to manage it in the most effective way. Human resources are often the most critical and dynamic part of any project, so mastering their management can significantly boost project success.

Creating a solid resource plan involves more than just assigning people to tasksits about strategically identifying needs, scheduling resources, and constantly refining the plan to ensure smooth execution. Lets break it down into five key steps:

1. Identify resource needs

The first step is identifying all the resources youll need for the project. In human resource planning, this means listing out the skills, expertise, and team members required to accomplish each task. In addition to human resources, consider the tools, equipment, and technology your team will need to succeed.

Example (Engineering): If you’re planning a construction project, you’ll need to identify engineers, construction workers, and project managers. Additionally, you’ll need specific materials like steel, concrete, and heavy machinery.

2. Allocate resources

Once you know what you need, its time to allocate your resources efficiently. Assign the right people to the right tasks based on their expertise, availability, and workload. Avoid overloading key team members and ensure everyone has a balanced workload.

 

Example (IT): In a web development project, assign your front-end developers to tasks like user interface design, while back-end developers focus on server-side logic.

3. Set up a resource schedule

Create a timeline that outlines when each resource will be needed. Use tools like Gantt charts or project management software to visualize the projects timeline, ensuring that resources are available at the right time without conflicts, such as when one team member is assigned too many tasks at once.

Example (Engineering): In a large-scale infrastructure project, set up a schedule that shows when civil engineers are needed for the design phase and when construction crews are required for implementation.

4. Monitor and adjust

Effective resource plans include mechanisms for tracking resource utilization in real-time and making adjustments as necessary. This ensures that as project conditions change, resources can be reallocated, timelines shifted, or workloads adjusted without derailing the entire project.

Example (Business Consulting): If a key consultant becomes unavailable mid-project, youll need to reallocate responsibilities to ensure deadlines are still met without overburdening the rest of the team.

5. Review and optimize

After the project is complete, review how well your resource plan worked. Did your team meet deadlines? Were there any bottlenecks or overworked individuals? Use this review process to identify areas for improvement, allowing you to optimize resource allocation for future projects.

Example (IT): In a software project, review whether the development team was over-allocated or if the project ran into issues due to poor scheduling of resources like testers or IT support.

 

To make resource planning even easier, there are many pre-designed templates available that can help streamline the process. These templates can serve as a starting point, providing a structured format for identifying, allocating, and tracking your resources.

Whether you’re in engineering, business consulting, or IT, a good template can save you time and ensure no critical resources are overlooked. If you’re looking for a comprehensive resource planning template to get started, check out this article on resource planning templates that offers ready-to-use tools tailored to various industries and project types. Incorporating one of these into your workflow will provide a solid foundation for building your resource plan efficiently.

What are the requirements for successful resource planning?

Resource planning involves several key items that are essential for its success, including:

Time tracking

This involves monitoring the amount of time spent on each task or project. Time tracking helps to identify areas where resources are being underutilized or where tasks are taking longer than anticipated, which can impact the overall project schedule. It is vital to make sure that it is easy and convenient for the team to track time, otherwise, this practice might be ignored or sabotaged.

Estimation of efforts

Time or effort estimation involves estimating the number of hours required to complete each task or project. Accurate effort estimation helps ensure that adequate resources are allocated to each task, preventing over or underutilization of resources.

Project Schedule

Another key item that is essential for successful resource planning is a detailed list of project tasks along with their duration. It is important to identify and prioritize project tasks based on their level of importance and their dependencies on other tasks. This helps to ensure that resources are allocated appropriately and that the project stays on track.

Resource availability

This involves tracking the availability of each resource, including team members, equipment, and other resources required to complete the project. This includes tracking vacations, holidays, out-of-office hours, and other information related to the peoples workload. It is advisable to find resource management software that includes this functionality or integrates with the companys HR systems.

Even the most well-intentioned resource planning efforts can go off track if common mistakes arent avoided. In our experience, weve seen several recurring pitfalls in resource planning that can lead to project delays, cost overruns, and team burnout. Lets take a closer look at these mistakes and how to avoid them:

1. Over-allocating resources

One of the most frequent mistakes in resource planning is over-allocating resources, particularly human resources. Its tempting to assign your best team members to multiple critical tasks, but this can lead to burnout, mistakes, and reduced productivity over time. When individuals are spread too thin, they cant focus on delivering high-quality work, and the project timeline suffers.

How to avoid it: Always consider the capacity of your team members and ensure they have enough time and energy to complete tasks without being overloaded. Use resource planning tools that flag over-allocation, allowing you to balance workloads more effectively.

2. Inaccurate time estimation

Underestimating or overestimating the time required for tasks is another common problem. If you underestimate, your team will be under pressure to meet impossible deadlines, leading to rushed work and errors. On the other hand, overestimating time can result in inefficiencies, where resources sit idle and tasks drag on unnecessarily.

How to avoid it: Base your time estimates on real data and past experience. Involve team members in the estimation process, as they often have a better understanding of how long tasks will take. Build in buffer time for unexpected challenges but avoid excessive padding that can lead to complacency.

3. Failure to track resource utilization

Resource utilization is critical to the success of your plan, but many project managers fail to monitor how effectively resources are being used throughout the project. When you dont track utilization consistently, you may miss signs that resources are being overworked or underutilized, leading to inefficiencies or burnout.

How to avoid it: Regularly monitor resource allocation and adjust as needed. Use tools that provide real-time data on resource utilization so you can see who is overburdened and who has extra capacity. This allows you to reallocate resources before problems escalate.

4. Ignoring team capacity

Another frequent mistake is ignoring the true capacity of your team members. Each person has limits on how much work they can handle in a given time period, and these limits vary based on the complexity of the tasks and individual strengths. Failing to account for these factors can lead to unrealistic expectations and poor performance.

How to avoid it: Get a clear understanding of each team members workload and capacity. In addition to their project tasks, take into account any other responsibilities they may have. Make sure the resource plan reflects these limits, allowing enough time for rest and high-quality work output.

In todays fast-paced project environments, the question isnt whether you can manage resources manually but whether you should. Resource planning tools offer significant advantages over traditional methods like spreadsheets or manual tracking, especially in large and complex projects.

When managing multiple resources, shifting timelines, and various team members, manual methods can quickly become overwhelming and error-prone. Spreadsheets require constant updating, which increases the risk of outdated information or missed details. Plus, manually adjusting resource allocations when project changes occur is time-consuming and can lead to confusion.

Using dedicated resource planning tools helps streamline this process by offering automated features that track resources, update schedules in real-time, and prevent bottlenecks. These tools provide a holistic view of who is working on what, when, and how efficiently, helping project managers make informed decisions faster.

In short, for businesses with intricate projects, dynamic resources, or large teams, a dedicated resource planning tool isnt just usefulits essential for efficiency, accuracy, and overall project success.

The power of grouping

One of the most effective ways to manage resources in a complex project environment is by using the grouping functionality. This feature allows you to organize your resources in several strategic waysby project, by resource, or by job role. Each grouping option offers unique insights that help you allocate and monitor resources efficiently across multiple projects.

Grouping by project

Grouping by project ensures that you can clearly see which resources are dedicated to which projects. This is particularly helpful when managing multiple projects simultaneously, as it reduces the likelihood of conflicts in resource allocation and helps ensure that each project has the right people at the right time.

Why it’s important: Grouping by project allows project managers to quickly assess whether each project is sufficiently staffed and if resource allocation aligns with the projects priority. For example, in a consulting firm managing several client projects, this view ensures that the highest-priority client projects have adequate resources.

Grouping by resource

This grouping method shows a breakdown of all your resources (both named and unnamed) and their current assignments. By organizing resources in this way, you can easily see how each person or resource is utilized across different projects and whether they are over- or under-allocated.

Why it’s important: Grouping by resource is crucial for managing individual workloads and avoiding resource burnout. For example, if you notice a developer working on multiple software development projects at once, this view helps you identify over-allocations and rebalance the workload before it becomes an issue.

Grouping by job role

Grouping by job role provides a clear picture of how different roles, such as developers, designers, or analysts, are distributed across various projects. This grouping helps resource managers ensure they have the right mix of skills available to meet project demands and easily spot any imbalances in role distribution.

Why it’s important: By using the job role grouping, resource managers can assess if there is a shortage of a particular role, like DevOps engineers or project managers, which could impact project progress. This view is essential for workforce planning, as it helps ensure the company has the right talent mix to meet current and future project demands.

Finding the right candidates: leveraging AI

One of the most innovative features in Birdviews resource planning module is the ability to find candidates for unfilled positions using AI. This function automatically suggests the best available resources by availability, roles, skills, and hourly rate for unnamed roles, ensuring that projects have the talent they need even if the original team is incomplete.

Why it’s important: This saves project managers from having to search manually for team members to fill critical roles, speeding up the planning process. In industries like consulting or engineering, where skillsets are highly specialized, this feature ensures that the right people are matched with the right jobs.

Managing allocations

Allocations represent how much time or capacity a resource is reserved for a specific project. Birdview offers a clear distinction between soft and hard allocations, giving you the flexibility to manage resources based on their availability and project demands.

Soft allocations: These are tentative assignments, giving you flexibility as resources can still be reallocated to other projects until final decisions are made. This is useful in the early stages of project planning, where the allocation isn’t fully locked in.

Hard allocations: These are firm commitments where a resources capacity is consumed for a project. This ensures that no other project can pull that resource away, and you can rely on them being fully dedicated to your project.

The visual representation of these allocations on a Gantt chart within Birdview makes it easy to see how resources are allocated over time. Color-coded bars distinguish between soft, hard, and unnamed resource allocations, helping project managers quickly spot any over- or under-utilization.

Why it’s important: This flexibility between soft and hard allocations ensures that project managers can plan resources effectively without immediately locking them in, which is especially valuable in fast-paced environments like IT or engineering, where project scopes may change.

Drag-and-drop scheduling

Ease of use is crucial in any tool, and drag-and-drop scheduling makes it simple to allocate and reallocate resources on the go. This feature allows project managers to shift tasks, assign new team members, or reschedule milestones without needing complex inputs or manual adjustments.

Example (engineering): If a contractor is delayed due to weather conditions, you can easily drag tasks to a new start date and reassign available workers to other priority tasks.

Scheduled vs. allocated hours

In resource planning, its critical to differentiate between scheduled hours and allocated hours. Birdview clearly separates these two to give project managers a better understanding of how resources are actually being used.

Scheduled hours: These refer to the hours assigned to specific tasks within a project. Its essentially a task-level commitment, where project managers schedule resources for particular deliverables.

Allocated hours: These reflect a broader, project-level booking of resource capacity. Its the responsibility of resource managers to ensure that these bookings align with the scheduled hours across projects.

Why it’s important: This distinction allows for better coordination between project managers and resource managers. While project managers focus on task-specific needs, resource managers ensure that overall resource capacity is efficiently allocated across the organization.

Automated resource allocation

One of the standout features of Birdviews resource planning module is the ability to automatically generate allocations based on scheduled hours. This is a huge time-saver, especially for larger projects or teams. The system generates soft allocations for resources that have scheduled hours, ensuring that no manual effort is needed to book resources.

Why it’s important: Automated allocations reduce the risk of human error and save time, especially in dynamic environments where project demands frequently shift. This ensures that resources are consistently allocated in a way that reflects their actual workload.

Resource requests and approvals

Resource requests are a critical part of professional resource planning, particularly in larger organizations where multiple teams compete for the same pool of resources. Birdviews resource request functionality streamlines the collaboration between project managers and resource managers. By requesting allocation approvals, managers ensure that no resource allocation goes overlooked.

Requesting resources: Project managers can request specific resources for their projects, and resource managers can approve or reject these requests based on availability and priorities.

Approval process: Once the request is submitted, the system alerts the appropriate resource managers, who can either approve the allocation (making it a hard allocation) or reject it (keeping it as a soft allocation).

Why it’s important: This structured request and approval process ensures that the right people are working on the right projects. It prevents overallocation and provides a clear, trackable system for managing resources efficiently.

Capacity management: monitoring utilization

Capacity management is a core component of resource planning, and Birdview offers powerful tools for monitoring resource utilization. Through visual tools like histograms and bar charts, managers can track whether resources are underloaded, fully utilized, or overloaded.

Utilization tracking: Histograms display resource usage in real-time, showing where team members are at full capacity and where adjustments need to be made. This helps avoid bottlenecks and ensures that no resource is underused.

Why it’s important: By monitoring utilization, you can ensure that resources are being used optimally. Overloaded employees may lead to burnout and missed deadlines, while underutilized resources are wasted. This feature helps managers strike the right balance.

Powerful and flexible reporting

A critical aspect of professional resource planning is having access to powerful and flexible reporting that provides deep insights into your teams capacity, project demands, and overall business performance. Birdviews resource planning module offers a range of reporting features that enable project and resource managers to make data-driven decisions, optimize resource utilization, and ensure long-term success. Lets explore some of the key benefits of this advanced reporting capability:

  • Forecast project resource demand

Birdviews reporting tools allow you to forecast future resource demand and compare it against current availability. This gives you a clear picture of whether you have enough resources to meet upcoming project needs. By identifying potential shortages ahead of time, you can create actionable strategies to avoid bottlenecks or resource gaps.

  • Make hiring decisions

With demand projection reports, you can make informed training and hiring decisions. These reports enable you to decide whether to upskill your existing team or bring in new talentwhether in-house or remoteto meet future project needs. This proactive approach helps you build a more resilient team that can adapt to changing business demands.

  • Take on more work with confidence

Birdviews reporting tools also help you visualize your teams estimated workload, categorized by project type. By reviewing ongoing projects and progress, you can identify whether your team has the capacity to take on additional work. This feature is particularly useful for managing billable work and increasing profitability.

  • Identify areas for improvement

One of the most valuable features of Birdviews reporting capabilities is the ability to analyze billable and non-billable resource utilization. By tracking how resources are used across different types of work, you can gain insights into inefficiencies, lost profits, or opportunities for business growth. This allows you to make informed decisions about how to allocate resources more effectively and improve overall performance.

Here are seven strategies that will help you build a resource plan that works, no matter the size or complexity of your business:

1. Assess current resource utilization

Before you can plan for future projects, you need to have a clear picture of how your resources are being used right now. Take the time to assess your current resource utilizationthis includes people, equipment, and budgets. Are there any underutilized resources that could be allocated elsewhere? Are certain team members stretched too thin?

Best practice: Use tools that provide real-time data on resource utilization so you can see where the imbalances are. This will help you avoid overloading your team and ensure every resource is being used efficiently.

2. Prioritize projects and tasks

Not all projects are created equal, and thats okay. Whats important is making sure that critical projects and tasks are given priority when it comes to allocating resources. Some tasks are time-sensitive, while others are less urgent. By ranking your projects by priority, you can make sure the most important work gets the resources it needs.

Best practice: Clearly communicate to your team and stakeholders which projects are top priority. This ensures that everyone is aligned and that critical tasks are completed on time.

3. Use data-driven forecasting

When it comes to predicting future resource needs, guesswork isnt going to cut it. Instead, use data from past projects to inform your decisions. Look at how long tasks took, how many people were needed, and any delays you encountered. This will give you a clearer picture of what to expect for similar future projects.

Best practice: Implement a system that tracks past project data, such as task completion times and resource allocation. This will give you the insights you need to create more accurate forecasts for future projects.

4. Build flexibility into your plan

No matter how well you plan, unexpected things will happenteam members might get sick, project scopes may change, or new tasks could emerge. This is why its essential to build flexibility into your resource plan. Always plan for contingencies and have a backup strategy for when things dont go as expected.

Best practice: Set aside a buffer of extra resources or time to account for unforeseen changes. Having this cushion will allow you to adapt quickly without causing major delays.

5. Communicate with stakeholders

Its vital to keep all your stakeholders informed about your resource plan. This includes project managers, department heads, and even clients. Clear communication ensures that everyone is on the same page and avoids any surprises later on. It also ensures that your resource allocation decisions are backed by everyone involved.

Best practice: Schedule regular meetings with stakeholders to discuss resource needs and allocations. Be open to feedback and make adjustments when necessary. The more transparent the process, the smoother things will run.

6. Optimize through iteration

Resource planning isnt a set it and forget it task. Its something youll need to refine continuously based on real-time data and evolving project needs. After each project, review what worked and what didnt. Did certain resources go underused? Were some team members over-allocated? Use these insights to improve future plans.

Best practice: After every project, hold a debrief with your team to review how well the resource plan worked. This is a great way to learn from your mistakes and make each subsequent plan even more effective.

7. Leverage technology for efficiency

Managing resources manually is time-consuming and prone to error, especially when your projects or teams grow. Advanced resource planning tools can automate much of the process, making it easier to schedule, track, and adjust resources. These tools not only save time but also help you avoid costly mistakes by providing real-time insights and alerts.

Best practice: Invest in a resource planning tool that meets your business needs. Look for features like automated scheduling, real-time tracking, and the ability to integrate with your project management software. This will help you stay organized and ensure resources are allocated effectively.

Now, lets take things a step further. If youre looking to fine-tune your resource planning process even more, there are two advanced strategies you should consider: scenario planning and AI-driven resource management.

1. Scenario planning

Scenario planning is all about preparing for the unexpected. This strategy involves creating multiple what-if scenarios, so youre ready to shift resources quickly if things change. Whether its a sudden increase in scope or a key team member dropping out, scenario planning ensures youre never caught off guard.

Why its important: Lets say youre managing a construction project, and a critical material gets delayed. With scenario planning, you would already have alternative resource plans ready to go, allowing you to pivot smoothly without disrupting the project timeline.

Best practice: Develop resource plans for different possible scenarios before a project begins. This will help you respond quickly when things dont go as planned and reduce the stress of last-minute changes.

2. AI-driven resource management

Finally, theres AI-driven resource management, which takes everything to the next level. With AI analyzing real-time data, you can optimize your resource use on the fly, adjusting allocations based on performance, availability, and project demands. Its like having a supercharged project manager working alongside you, making adjustments instantly.

Why its important: Lets say youre running multiple IT projects, and one starts falling behind. AI can step in, analyze where the bottlenecks are, and suggest reallocating resources from lower-priority tasks to get things back on track.

Best practice: Use AI-driven tools to monitor and adjust resource allocation throughout the project continuously. Its a hands-off way to ensure youre always using your team and tools in the most efficient way possible.

As resource management professionals, weve seen how quickly the world of project management is changing. New trends and technologies are reshaping how we handle resources, making the process more efficient and flexible. Today, we want to highlight a few key trends in resource planning that are transforming the way we work. If you’re not using these approaches yet, it’s time to start thinking about how they can benefit your projects.

1. AI and predictive analytics

Lets start with AI and predictive analytics. These technologies are becoming a game-changer in resource planning. Instead of relying on gut feelings or old spreadsheets to estimate future needs, AI can now analyze past data to predict what resources will be needed, when, and where.

Why its important: Imagine youre working on an IT project, and youve always underestimated the time it takes to test software. With predictive analytics, the system can analyze previous testing phases and give you a more accurate estimate, so you dont fall behind schedule again.

Best practice: Use AI to forecast resource needs before a project even starts. These tools give you a much clearer picture of when and where resources will be stretched thin, helping you make smarter decisions from the get-go.

2. Automated resource allocation

Heres where things get even more exciting: automated resource allocation. This is where tools use machine learning to dynamically assign resources based on real-time data. No more manually shuffling tasks aroundthese systems can handle it for you.

Why its important: Lets say youre managing a business consulting project, and one of your team members suddenly becomes unavailable. Instead of scrambling to find someone to cover, an automated tool will immediately reassign tasks based on availability and skills, keeping the project moving smoothly.

Best practice: Invest in a tool that uses automated resource allocation. Itll save you time, prevent mistakes, and ensure your resources are always being used efficiently, even when things change at the last minute.

3. Remote work and distributed teams

With remote work becoming the new normal, resource planning has had to adapt. Managing teams that are spread across different locations and time zones can be tricky, but with the right tools, its manageable. Modern resource planning tools are built to handle this new way of working, helping you keep everyone connected and on the same page.

Why its important: Imagine youre working on a global engineering project, with team members in the US, Europe, and Asia. Scheduling meetings, allocating resources, and ensuring smooth communication can be a logistical nightmare. Remote-friendly tools allow for easy scheduling across time zones and help teams collaborate seamlessly, even when theyre not in the same room.

Best practice: Use cloud-based tools that offer real-time collaboration, shared dashboards, and integrated communication features. This will make managing remote teams much smoother and ensure nothing gets lost in translation.

Birdview logo
Nice! You’re almost there...

Your 14-day trial is ready! Explore Birdview's full potential by scheduling a call with our Product Specialist.

The calendar is loading... Please wait
Birdview logo
Great! Let's achieve game-changing results together!
Start your Birdview journey with a short 9-min demo
Watch demo video